NovaTech Equipment Manufacturing

Forty-two process skids, each with its own P&ID, built to pharmaceutical hygiene standards and delivered on a rolling schedule across nine months. Every skid was factory-acceptance tested before it left the building.

The Challenge

Pharmaceutical hygiene standards required documented surface finishes and full weld mapping on every wetted joint.

Our Solution

We set up a dedicated clean fabrication bay with its own tooling and ran weld mapping through a digital traceability system tied to each skid serial number.