Send drawings, a specification or even a rough scope through the contact form. An engineer — not a salesperson — reviews it and comes back within one business day with questions, a price and an indicative schedule.
Most fabrication contracts run six to fourteen weeks from approved drawings, driven mainly by material lead times. Automation and full plant fit-outs typically run four to nine months. We give you a dated programme with the quote, not after the order.
Yes. Our own field crews handle rigging, alignment, commissioning and operator training nationwide. Keeping installation in-house means one contract and one point of accountability rather than a chain of subcontractors.
We are ISO 9001 certified, weld to AWS D1.1, and fabricate pressure equipment to ASME Section VIII with in-house NDT and hydro testing. Every job ships with material certificates and a dimensional report.
Yes, and we will tell you honestly if we think something in them will cause problems downstream. Design-for-manufacture review happens before we quote, so any concerns are raised while changes are still cheap.